← All public questions

long_context-004

A public question in Long context, battery v1. Every answer is shown as the model gave it, as plain text.

24 of 33 ranked models (73%) answered this correctly, from run r20261102-bv1-5246ab. Some of the models below ran in another run and are not in this count.

The question

Prompt

Below are internal documents from Northfold Instruments. Read them carefully, then answer the question that follows the documents.

LAB NOTEBOOK | Entry LAB/26/388
Analyst: Gareth Baptiste
Instrument: thermal camera
Date: 2026-02-03

Several people asked for clearer guidance on cleaning-room scheduling; Tariq Underhill will draft a short FAQ. Calibration of the thermal camera was checked against the reference standard before each run. The Project Quillon team asked that the cleaning-room scheduling figures be checked against the ledger before wider circulation. Throughput at Ashby Moor averaged 417 pallets per week during July, compared with 711 the month before. Customer Success would like 

[... 9,118 characters omitted ...]

the item was closed after about 10 minutes of discussion. No further action is needed on lab ventilation unless the defect rate drifts by more than 8.5 percent. Item 16: packaging redesign. Ingrid Yamada summarised the position and the group noted a shortage of calibration weights. Petra Kowalczyk raised a concern about inconsistent labelling at the Kestrel Point site, and the team will revisit it on Thursday. A reminder that expense claims for customer escalation handling must be filed within 45 working days.

Question: On what date is the stakeholder briefing for Project Cobalt Fen scheduled? Answer in YYYY-MM-DD format.

Give your final answer on the last line in the form: ANSWER: <value>

This is a long-context item: only the start and the end of the prompt are shown here. The model saw the whole prompt.

Answers

228 answers; 8 withheld models not counted, best score first, then by model name. A dash means the answer has no definite score, which is different from a score of 0.

Aya 8B 23 pass score 1.00

Answer (generation ok, stop)

Answer: 2027-06-06

This answer on the page of Aya 8B 23

Aya Expanse 8B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Aya Expanse 8B

Codestral 22B V0.1 pass score 1.00

Answer (generation ok, stop)

 The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Codestral 22B V0.1

Cogito 14B V1 Preview Qwen pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Cogito 14B V1 Preview Qwen

Cogito 3B V1 Preview Llama pass score 1.00

Answer (generation ok, stop)

Based on the provided documents, I found that the stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027. This information appears in multiple documents:

1. LAB NOTEBOOK | Entry LAB/26/388
2. INTERNAL MEMO | Ref MEM/26/358
3. PROJECT STATUS REPORT | Project Ferrule

ANSWER: 2027-06-06

This answer on the page of Cogito 3B V1 Preview Llama

Command R 35B 08 2024 pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Command R 35B 08 2024

Command R7B (12-2024) pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Command R7B (12-2024)

Command R7B Arabic 7B 02 2025 pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Command R7B Arabic 7B 02 2025

Deepseek R1 1.5B Qwen Distill pass score 1.00

Answer (generation ok, stop)


The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Deepseek R1 1.5B Qwen Distill

DeepSeek-Coder-V2-Lite-Instruct pass score 1.00

Answer (generation ok, stop)

 ANSWER: 2027-06-06

This answer on the page of DeepSeek-Coder-V2-Lite-Instruct

DeepSeek-R1-0528-Qwen3-8B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of DeepSeek-R1-0528-Qwen3-8B

DeepSeek-R1-Distill-Qwen-32B pass score 1.00

Answer (generation ok, stop)


The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027, which translates to 2027-06-06 in the required format.

ANSWER: 2027-06-06

This answer on the page of DeepSeek-R1-Distill-Qwen-32B

Devstral 24B Small 2505 pass score 1.00

Answer (generation ok, stop)

To determine the date of the stakeholder briefing for Project Cobalt Fen, I need to search through the provided documents for any mention of this project and its related events.

Let's examine the relevant documents:

1. INTERNAL MEMO | Ref MEM/26/774 (2026-05-09):
   - Mentions: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

2. MEETING MINUTES | Ref MIN/26/593 (2026-09-15):
   - Mentions: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

From these documents, we can see that the stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Devstral 24B Small 2505

Devstral Small 2 24B Instruct (2512) pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Devstral Small 2 24B Instruct (2512)

dolphin-2.9.1-yi-1.5-34b pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of dolphin-2.9.1-yi-1.5-34b

Exaone Deep 2.4B pass score 1.00

Answer (generation ok, stop)

<thought>
Okay, let's tackle this question. The user is asking for the date of the stakeholder briefing for Project Cobalt Fen based on the provided internal documents. Let me go through the relevant sections step by step.

First, I'll look through the PROJECT STATUS REPORT entries. There's one under Project Ferrule, but the question is about Project Cobalt Fen. Wait, maybe I missed it. Let me check again.

Looking at the PROJECT STATUS REPORT sections: The first one is Project Vellum, then Project Ferrule. The question mentions Project Cobalt Fen. Hmm, maybe I need to check other sections. Wait, there's a PROJECT STATUS REPORT for Project Cobalt Fen? Let me check again.

Wait, in the MEETING MINUTES section under Procurement weekly sync, there's a mention of Project Cobalt Fen. Let me check that. 

In the MEETING MINUTES entry under Procurement weekly sync (Ref MIN/26/593), there's a note: "The Fenwick Tooling contract renewal was discussed briefly; Lucia Thorsby will ask for a revised quote reflecting the 3-month term. Rhea Moreau will circulate a one-page summary of the packaging redesign options before the next meeting." 

Wait, but the question is about Project Cobalt Fen's stakeholder briefing. The mention here is about Fenwick Tooling, not Cobalt Fen. Maybe I need to look elsewhere.

Looking at the PROJECT STATUS REPORT entries again. The user might have a typo, but let me check again. The question specifically says "Project Cobalt Fen". Let me check all the PROJECT STATUS REPORT entries.

Another PROJECT STATUS REPORT is under Project Vellum (ending 2026-07-19), then Project Ferrule (ending 2026-06-18). The question's answer might be in another section. Wait, perhaps the user made a mistake in the project name? Alternatively, maybe I missed a section.

Wait, looking at the INTERNAL MEMO sections. There's one under Ref MEM/26/358 about Waste handling, but not related. The MEETING MINUTES has a mention of Project Cobalt Fen? Let me check again.

Wait, in the M

Cut here for length. The model page has the full answer.

This answer on the page of Exaone Deep 2.4B

Exaone3.5 32B Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Exaone3.5 32B Instruct

Falcon3 3B Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Falcon3 3B Instruct

Flint 40B A2B pass score 1.00

Answer (generation ok, stop)

We need answer question. Need parse documents. Need find stakeholder briefing for Project Cobalt Fen scheduled date. We need answer YYYY-MM-DD format, final line ANSWER: <value>.

Let's search. Internal Memo MEM/26/774: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." Meeting minutes maybe budget review for Project Cobalt Fen scheduled for 16 November 2027. Project status? No.

Question: On what date is the stakeholder briefing for Project Cobalt Fen scheduled? Answer in YYYY-MM-DD format.

So date is 2027-06-06. Need final answer on last line in form ANSWER: <value>. Could include just final. Ensure YYYY-MM-DD. 
</think>ANSWER: 2027-06-06

This answer on the page of Flint 40B A2B

Gemma 2B Instruct V1.1 pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Gemma 2B Instruct V1.1

Gemma 4 12B IT pass score 1.00

Answer (generation ok, stop)

To find the date of the stakeholder briefing for Project Cobalt Fen, I will scan the provided documents for that specific project name.

1.  **LAB NOTEBOOK | Entry LAB/26/388**: Mentions Project Quillon, but not Cobalt Fen.
2.  **INTERNAL MEMO | Ref MEM/26/774**: This document contains the sentence: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."
3.  **PROJECT STATUS REPORT | Project Vellum**: Mentions Project Meridian, but not Cobalt Fen.
4.  **LAB NOTEBOOK | Entry LAB/26/944**: No mention of Cobalt Fen.
5.  **INTERNAL MEMO | Ref MEM/26/358**: Mentions Project Ferrule and Project Ibis, but not Cobalt Fen.
6.  **PROJECT STATUS REPORT | Project Ferrule**: Mentions Project Alder, but not Cobalt Fen.
7.  **MEETING MINUTES | Ref MIN/26/593**: Mentions Project Cobalt Fen in the context of a budget review (16 November 2027), but not the stakeholder briefing.

The date for the stakeholder briefing for Project Cobalt Fen is explicitly stated in the Internal Memo (Ref MEM/26/774) as 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Gemma 4 12B IT

gemma-2-9b-it pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027. 


ANSWER: 2027-06-06 

This answer on the page of gemma-2-9b-it

gemma-3-12b-it pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of gemma-3-12b-it

gemma-3-27b-it pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of gemma-3-27b-it

gemma-3-4b-it pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of gemma-3-4b-it

gemma-4-26B-A4B-it pass score 1.00

Answer (generation ok, stop)

To find the scheduled date for the stakeholder briefing for Project Cobalt Fen, we must scan the provided documents for "Project Cobalt Fen" and "stakeholder briefing."

1.  **LAB/26/388**: Mentions Project Quillon.
2.  **MEM/26/774**: Mentions "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."
3.  **Project Vellum Report**: Mentions Project Vellum and Project Meridian.
4.  **LAB/26/944**: No mention of Project Cobalt Fen.
5.  **MEM/26/358**: Mentions Project Ibis and Project Ferrule.
6.  **Project Ferrule Report**: Mentions Project Alder and Project Lantern.
7.  **MIN/26/593**: Mentions "The budget review for Project Cobalt Fen is scheduled for 16 November 2027," but this is a budget review, not the stakeholder briefing.

The only document containing the specific information for the stakeholder briefing for Project Cobalt Fen is the internal memo **MEM/26/774**, which states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Converting 6 June 2027 to YYYY-MM-DD format results in 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of gemma-4-26B-A4B-it

gemma-4-31B-it pass score 1.00

Answer (generation ok, stop)

To find the date of the stakeholder briefing for Project Cobalt Fen, I reviewed the provided documents:

1.  **LAB NOTEBOOK | Entry LAB/26/388**: No mention of Project Cobalt Fen.
2.  **INTERNAL MEMO | Ref MEM/26/774**: This document states, "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."
3.  **PROJECT STATUS REPORT | Project Vellum**: No mention of Project Cobalt Fen.
4.  **LAB NOTEBOOK | Entry LAB/26/944**: No mention of Project Cobalt Fen.
5.  **INTERNAL MEMO | Ref MEM/26/358**: No mention of Project Cobalt Fen.
6.  **PROJECT STATUS REPORT | Project Ferrule**: No mention of Project Cobalt Fen.
7.  **MEETING MINUTES | Ref MIN/26/593**: Mentions a "budget review for Project Cobalt Fen" on 16 November 2027, but not the stakeholder briefing.

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of gemma-4-31B-it

Gemma2 27B Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Gemma2 27B Instruct

Gemma2 2B Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06 

This answer on the page of Gemma2 2B Instruct

Gemma4 E2B IT pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Gemma4 E2B IT

Gemma4 E4B IT pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027, as stated in the INTERNAL MEMO | Ref MEM/26/774.

ANSWER: 2027-06-06

This answer on the page of Gemma4 E4B IT

GLM-4.5-Air pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of GLM-4.5-Air

gpt-oss-120b pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of gpt-oss-120b

gpt-oss-20b pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of gpt-oss-20b

Granite4.1 30B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Granite4.1 30B

Granite4.2 30B pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is mentioned in two documents:

1. In the INTERNAL MEMO (Ref MEM/26/774), it states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

2. In the MEETING MINUTES (Ref MIN/26/593), it states: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

However, the question specifically asks for the **stakeholder briefing** date, not the budget review. Therefore, the correct date comes from the INTERNAL MEMO: 6 June 2027.

Answered in YYYY-MM-DD format: 2027-06-06

ANSWER: 2027-06-06

This answer on the page of Granite4.2 30B

Granite4.2 8B pass score 1.00

Answer (generation truncated, length)

The stakeholder briefing for Project Cobalt Fen is mentioned in two documents:

1. In INTERNAL MEMO | Ref MEM/26/774 (Date: 2026-05-09), it states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

2. In PROJECT STATUS REPORT | Project Vellum, it mentions: "The stakeholder briefing for Project Lantern team is scheduled for 6 June 2027" — but this refers to Project Lantern, not Project Cobalt Fen.

3. In PROJECT STATUS REPORT | Project Ferrule, it mentions: "The stakeholder briefing for Project Lantern is scheduled for 19 July 2027" — again, Project Lantern, not Cobalt Fen.

4. In MEETING MINUTES | Ref MIN/26/593, it mentions: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027" — but not the stakeholder briefing.

Thus, the only explicit mention of the stakeholder briefing for Project Cobalt Fen is in INTERNAL MEMO | Ref MEM/26/774: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

"6 June 2027" must be converted to YYYY-MM-DD format. June 6, 2027 → 2027-06-06.

No other document contradicts or clarifies this date for the stakeholder briefing of Project Cobalt Fen.

Thus, the date is 2027-06-06.

Answer in YYYY-MM-DD: 2027-06-06.

Final answer must be on the last line as "ANSWER: <value>".

Thus: ANSWER: 2027-06-06
</think>

This answer on the page of Granite4.2 8B

Internlm2 7B Chat V2.5 pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06[UNUSED_TOKEN_145]

This answer on the page of Internlm2 7B Chat V2.5

Laguna XS 2.1 pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Laguna XS 2.1

Lfm2 24B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Lfm2 24B

Lfm2.5 8B A1B pass score 1.00

Answer (generation truncated, length)

<think>
We need to find the date of the stakeholder briefing for Project Cobalt Fen. The question says "On what date is the stakeholder briefing for Project Cobalt Fen scheduled?" We have multiple internal documents referencing this.

From the first document (LAB NOTEBOOK entry LAB/26/388) we see: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." That's one mention. Also later in another document (maybe follow-ups?), there might be a different date? Let's check.

In the second internal memo (Ref MEM/26/774) maybe not. In the third internal memo (MEM/26/358) about waste handling, no mention of Project Cobalt Fen. In the fourth internal memo (MEM/26/358) again? Actually there is a "Project Lantern" etc.

Later in the second set of notes: "The stakeholder briefing for Project Lantern is scheduled for 19 July 2027." Not relevant.

In the last part, we have "The budget review for Project Cobalt Fen is scheduled for 16 November 2027." That's about budget review, not stakeholder briefing. So the date for stakeholder briefing appears to be 6 June 2027.

Thus answer: 2026-06-06? Wait format: YYYY-MM-DD. The date given: "6 June 2027". In YYYY-MM-DD that would be 2027-06-06. However we need to ensure if any other mention says something else. Let's search all documents for "Project Cobalt Fen".

First document (LAB/26/388) entry: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." That's the only direct statement.

Later, there might be a note about "stakeholder

This answer on the page of Lfm2.5 8B A1B

Lfm3 VL 2B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Lfm3 VL 2B

Llama 4 Scout 17B-16E Instruct pass score 1.00

Answer (generation ok, stop)

To find the date of the stakeholder briefing for Project Cobalt Fen, we need to look through the provided documents for any mention of Project Cobalt Fen and its scheduled briefing.

Upon reviewing the documents, we find a mention of Project Cobalt Fen in the INTERNAL MEMO Ref MEM/26/774 dated 2026-05-09. The relevant excerpt states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

We also find another mention in the MEETING MINUTES Ref MIN/26/593 dated 2026-09-15, which mentions: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027." However, this is not about the stakeholder briefing but about the budget review.

Given the information, the stakeholder briefing for Project Cobalt Fen is scheduled for 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Llama 4 Scout 17B-16E Instruct

Llama-3.1-8B-Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Llama-3.1-8B-Instruct

Llama-3.2-3B-Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Llama-3.2-3B-Instruct

Llama-3.3-70B-Instruct pass score 1.00

Answer (generation ok, stop)

To find the answer, we need to look for the date of the stakeholder briefing for Project Cobalt Fen in the provided documents.

In the INTERNAL MEMO | Ref MEM/26/774, it is mentioned that "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Therefore, the date of the stakeholder briefing for Project Cobalt Fen in YYYY-MM-DD format is 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Llama-3.3-70B-Instruct

Llama3.2 1B Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Llama3.2 1B Instruct

Magistral Small (2506) pass score 1.00

Answer (generation ok, stop)

**Summary:**
The stakeholder briefing for Project Cobalt Fen is mentioned in two documents: an internal memo and meeting minutes, both stating the date as 6 June 2027. Converting this to YYYY-MM-DD format gives 2027-06-06. No other dates or conflicting information about this event were found in the provided documents.

ANSWER: 2027-06-06

This answer on the page of Magistral Small (2506)

Marco O1 7B pass score 1.00

Answer (generation ok, stop)

<Thought>
Alright, I need to determine the date of the stakeholder briefing for Project Cobalt Fen based on the provided internal documents. Let's go through each document systematically to find relevant information.

First, I'll look at the PROJECT STATUS REPORT for Project Vellum. It mentions "stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." That's a clear reference, but I should check if there are any other documents that might provide a different or more specific date.

Next, I'll examine the INTERNAL MEMO from Ingrid Cavendish to all Facilities staff. It discusses various projects and mentions "stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." This seems consistent with the previous report.

Then, I'll check the PROJECT STATUS REPORT for Project Ferrule. It states, "stakeholder briefing for Project Lantern is scheduled for 19 July 2027." Wait, that's for Project Lantern, not Cobalt Fen. So, this doesn't help with Cobalt Fen.

Moving on, the INTERNAL MEMO from Gareth Gunnarsen to all Quality Assurance staff mentions "stakeholder briefing for Project Ferrule is scheduled for 10 June 2027." Again, this is for Project Ferrule, not Cobalt Fen.

I'll also look at the MEETING MINUTES for the Procurement weekly sync. It says, "Fenwick Tooling contract renewal was discussed briefly; Lucia Thorsby will ask for a revised quote reflecting the 3-month term." This doesn't provide any date related to the stakeholder briefing.

Lastly, I'll review the PROJECT STATUS REPORT for Project Ferrule again, but it doesn't offer any new information regarding the stakeholder briefing for Project Cobalt Fen.

After thoroughly examining all the documents, the only consistent date mentioned for the stakeholder briefing related to Project Cobalt Fen is 6 June 2027.

</Thought>
<Output>
ANSWER: 2027-06-06
</Output>

This answer on the page of Marco O1 7B

Mathstral 7B V0.1 pass score 1.00

Answer (generation ok, stop)

2027-06-06

This answer on the page of Mathstral 7B V0.1

Medgemma 27B IT pass score 1.00

Answer (generation ok, stop)

The documents provided contain the following information regarding the stakeholder briefing for Project Cobalt Fen:

*   **INTERNAL MEMO | Ref MEM/26/774:** "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."
*   **MEETING MINUTES | Ref MIN/26/593:** "The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

The question asks for the date of the stakeholder briefing. The relevant information is found in the internal memo.

The date is 6 June 2027. In YYYY-MM-DD format, this is 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Medgemma 27B IT

Medgemma1.5 4B IT pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Medgemma1.5 4B IT

Meta-Llama-3-8B-Instruct pass score 1.00

Answer (generation ok, stop)

After reading the internal documents, I found the answer to the question:

ANSWER: 2027-06-06

This answer on the page of Meta-Llama-3-8B-Instruct

Ministral 3 14B Instruct (2512) pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for **6 June 2027** as mentioned in the Internal Memo (Ref MEM/26/774).

ANSWER: 2027-06-06

This answer on the page of Ministral 3 14B Instruct (2512)

Ministral 3 3B Instruct 2512 pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Ministral 3 3B Instruct 2512

Ministral 3 8B Instruct 2512 pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for **6 June 2027** according to the internal memo (MEM/26/774).

ANSWER: 2027-06-06

This answer on the page of Ministral 3 8B Instruct 2512

Mistral 7B Instruct V0.3 pass score 1.00

Answer (generation ok, stop)

 ANSWER: 2027-06-06

This answer on the page of Mistral 7B Instruct V0.3

Mistral Small 22B Instruct 2409 pass score 1.00

Answer (generation ok, stop)

 ANSWER: 2027-06-06

This answer on the page of Mistral Small 22B Instruct 2409

Mistral Small 24B Instruct 2501 pass score 1.00

Answer (generation ok, stop)

To determine the date of the stakeholder briefing for Project Cobalt Fen, we need to look through the provided documents for any mention of this project and its scheduled briefing.

From the documents:
- The **INTERNAL MEMO | Ref MEM/26/774** mentions: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Therefore, the stakeholder briefing for Project Cobalt Fen is scheduled for:

ANSWER: 2027-06-06

This answer on the page of Mistral Small 24B Instruct 2501

Mistral Small 3.2 24B Instruct (2506) pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Mistral Small 3.2 24B Instruct (2506)

Mistral Small3.1 24B Instruct 2503 pass score 1.00

Answer (generation ok, stop)

To determine the date of the stakeholder briefing for Project Cobalt Fen, we need to carefully examine the provided documents.

1. **INTERNAL MEMO | Ref MEM/26/774**:
   - This memo does not mention the stakeholder briefing for Project Cobalt Fen.

2. **PROJECT STATUS REPORT | Project Vellum**:
   - This report does not mention the stakeholder briefing for Project Cobalt Fen.

3. **LAB NOTEBOOK | Entry LAB/26/944**:
   - This lab notebook entry does not mention the stakeholder briefing for Project Cobalt Fen.

4. **INTERNAL MEMO | Ref MEM/26/358**:
   - This memo does not mention the stakeholder briefing for Project Cobalt Fen.

5. **PROJECT STATUS REPORT | Project Ferrule**:
   - This report does not mention the stakeholder briefing for Project Cobalt Fen.

6. **MEETING MINUTES | Ref MIN/26/593**:
   - This document mentions: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027."
   - This document does not mention the stakeholder briefing for Project Cobalt Fen.

7. **LAB NOTEBOOK | Entry LAB/26/388**:
   - This lab notebook entry mentions: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Based on the information provided in the documents, the stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Mistral Small3.1 24B Instruct 2503

Mistral-7B-Instruct-v0.2 pass score 1.00

Answer (generation ok, stop)

 ANSWER: 2027-06-06

This answer on the page of Mistral-7B-Instruct-v0.2

Muse Glimmer 30B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Muse Glimmer 30B

Nemotron 3.5 Bolt E4B pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is mentioned in two documents:

1. **INTERNAL MEMO | Ref MEM/26/774 (Dated 2026-05-09):** "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."
2. **MEETING MINUTES | Ref MIN/26/593 (Dated 2026-09-15):** "The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

Since the question asks for the "stakeholder briefing," the date provided in the memo (MEM/26/774) is the most direct answer for the briefing, which is 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Nemotron 3.5 Bolt E4B

Nemotron 3.5 Lightning 30B A3B pass score 1.00

Answer (generation ok, stop)

2027-06-06

This answer on the page of Nemotron 3.5 Lightning 30B A3B

Nemotron Cascade 2 30B A3B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Nemotron Cascade 2 30B A3B

Nemotron3 33B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Nemotron3 33B

NVIDIA Nemotron 3 Nano 30B-A3B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of NVIDIA Nemotron 3 Nano 30B-A3B

Olmo 3.1 32B Instruct pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027. 

Looking at the documents, the only mention of a stakeholder briefing for Project Cobalt Fen is in the PROJECT STATUS REPORT | Project Ferrule (ending 2026-06-18), which states: "The stakeholder briefing for Project Lantern is scheduled for 19 July 2027." However, the question asks about Project Cobalt Fen, not Project Lantern.

But in the MEETING MINUTES | Ref MIN/26/593, it says: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027." However, this is a budget review, not a stakeholder briefing.

Re-examining all documents, there is no explicit mention of a stakeholder briefing for Project Cobalt Fen with a date. The only date related to Project Cobalt Fen is the budget review on 16 November 2027. However, the question specifically asks for the stakeholder briefing date.

But in the first PROJECT STATUS REPORT (Project Vellum), it says: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." This is the only direct mention of a stakeholder briefing for Project Cobalt Fen.

Therefore, the date for the stakeholder briefing for Project Cobalt Fen is 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Olmo 3.1 32B Instruct

Olmo-3-7B-Think pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Olmo-3-7B-Think

Olmo2 13B 1124 Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Olmo2 13B 1124 Instruct

Openthinker 7B V2 pass score 1.00

Answer (generation ok, stop)

<think>
Okay, let's tackle this question. The user is asking for the date of the stakeholder briefing for Project Cobalt Fen. I need to look through all the documents provided to find where this information is mentioned.

First, I'll start by scanning the documents one by one. The key terms here are "Project Cobalt Fen" and "stakeholder briefing". Let me check each document's subject or summary to see if any mention of the project's briefing exists.

Looking at the INTERNAL MEMO from Ingrid Cavendish (Ref MEM/26/774), the subject line is "Network segmentation". The body mentions that Purchasing notes that lead times for copper foil have stretched, and there's a discussion about waste handling. But I don't see Project Cobalt Fen here.

Next, the PROJECT STATUS REPORT for Project Vellum (ending 2026-07-19) talks about waste handling, expenses, and mentions that Purchasing notes about lead times. No mention of Project Cobalt Fen here either.

Then, the INTERNAL MEMO from Gareth Gunnarsen (Ref MEM/26/358) with the subject "Waste handling" again discusses waste handling options and a Project Ferrule team request. Still no Project Cobalt Fen.

Looking at the MEETING MINUTES for the Procurement weekly sync (Ref MIN/26/593), the group discusses Project Cobalt Fen's budget review scheduled for 16 November 2027. Wait, that's a date. The minutes mention the budget review is scheduled for 16 November 2027. But the question is about the stakeholder briefing, not the budget review. Hmm, maybe I need to check other documents.

Wait, the INTERNAL MEMO from Ingrid Cavendish (Ref MEM/26/774) mentions that the stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027. Let me check that again. Yes, in the body of that memo, under the "Subject: Network segmentation" section, it says: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." That's the date we're looking for.

Wait, but let me confirm. The user's question is about the stakeholder brie

Cut here for length. The model page has the full answer.

This answer on the page of Openthinker 7B V2

Ornith 9B pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is mentioned in the PROJECT STATUS REPORT | Project Vellum section: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

ANSWER: 2027-06-06

This answer on the page of Ornith 9B

Ornith-1.5-9B pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027, as stated in the INTERNAL MEMO (MEM/26/774): "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

ANSWER: 2027-06-06

This answer on the page of Ornith-1.5-9B

Phi-3.5-mini-instruct pass score 1.00

Answer (generation ok, stop)

2027-06-06

This answer on the page of Phi-3.5-mini-instruct

phi-4 pass score 1.00

Answer (generation ok, stop)

To determine the date of the stakeholder briefing for Project Cobalt Fen, we need to locate the relevant information in the provided documents.

1. **Project Status Report | Project Vellum**:
   - Mentions: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

2. **Meeting Minutes | Ref MIN/26/593**:
   - Mentions: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

The stakeholder briefing for Project Cobalt Fen is specifically mentioned in the Project Status Report | Project Vellum document as being scheduled for 6 June 2027.

Therefore, the date of the stakeholder briefing for Project Cobalt Fen is:

ANSWER: 2027-06-06

This answer on the page of phi-4

Phi3 14B Medium 128K Instruct pass score 1.00

Answer (generation ok, stop)

Ans: 2027-06-06

This answer on the page of Phi3 14B Medium 128K Instruct

Phi3 3.8B Mini 128K Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Phi3 3.8B Mini 128K Instruct

Phi4 Mini Reasoning 3.8B pass score 1.00

Answer (generation ok, stop)

<think>
Okay, let's see. The question is asking for the date of the stakeholder briefing for Project Cobalt Fen. I need to find this information in the provided documents.

Looking through the documents:

First, the LAB NOTEBOOK entry from 2026-07-02 mentions Project Cobalt Fen's briefing scheduled for 6 June 2027. Wait, let me check again. The line says: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." So that's June 6, 2027. The format is YYYY-MM-DD, so 2027-06-06.

Wait, but let me make sure there's no other mention. Checking other documents:

In the PROJECT STATUS REPORT for Project Vellum, there's a mention of Project Cobalt Fen's briefing scheduled for 6 June 2027. That's the same as the LAB NOTEBOOK entry. So the answer should be 2027-06-06.

I don't see any other mentions of Project Cobalt Fen. The other projects like Project Lantern, Project Ferrule, etc., have different dates. So the correct date is 2027-06-06.
</think>

ANSWER: 2027-06-06

This answer on the page of Phi4 Mini Reasoning 3.8B

Qwen2.5 1.5B Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Qwen2.5 1.5B Instruct

Qwen2.5-14B-Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Qwen2.5-14B-Instruct

Qwen2.5-32B-Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Qwen2.5-32B-Instruct

Qwen2.5-Coder-14B-Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Qwen2.5-Coder-14B-Instruct

Qwen2.5-Coder-32B-Instruct pass score 1.00

Answer (generation ok, stop)

To determine the date of the stakeholder briefing for Project Cobalt Fen, I'll review the documents for any mention of this event.

- **LAB NOTEBOOK | Entry LAB/26/388**: No mention of Project Cobalt Fen.
- **INTERNAL MEMO | Ref MEM/26/774**: Mentions a stakeholder briefing for Project Cobalt Fen scheduled for 6 June 2027.
- **PROJECT STATUS REPORT | Project Vellum**: No mention of Project Cobalt Fen.
- **LAB NOTEBOOK | Entry LAB/26/944**: No mention of Project Cobalt Fen.
- **INTERNAL MEMO | Ref MEM/26/358**: No mention of Project Cobalt Fen.
- **PROJECT STATUS REPORT | Project Ferrule**: No mention of Project Cobalt Fen.
- **MEETING MINUTES | Ref MIN/26/593**: Mentions a budget review for Project Cobalt Fen scheduled for 16 November 2027, but no stakeholder briefing.

Based on the information provided in the documents, the stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Qwen2.5-Coder-32B-Instruct

Qwen2.5-Coder-7B-Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Qwen2.5-Coder-7B-Instruct

Qwen2.5-VL-32B-Instruct pass score 1.00

Answer (generation ok, stop)

To determine the date of the stakeholder briefing for Project Cobalt Fen, let's analyze the relevant documents:

1. **INTERNAL MEMO | Ref MEM/26/774**:
   - This memo mentions: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

2. **MEETING MINUTES | Ref MIN/26/593**:
   - This document does not mention the stakeholder briefing for Project Cobalt Fen.

3. **PROJECT STATUS REPORT | Project Ferrule**:
   - This document does not mention the stakeholder briefing for Project Cobalt Fen.

4. **LAB NOTEBOOK | Entry LAB/26/944**:
   - This document does not mention the stakeholder briefing for Project Cobalt Fen.

5. **LAB NOTEBOOK | Entry LAB/26/388**:
   - This document does not mention the stakeholder briefing for Project Cobalt Fen.

6. **INTERNAL MEMO | Ref MEM/26/358**:
   - This document does not mention the stakeholder briefing for Project Cobalt Fen.

The only document that provides the date for the stakeholder briefing for Project Cobalt Fen is **INTERNAL MEMO | Ref MEM/26/774**, which states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

### Final Answer:
ANSWER: 2027-06-06

This answer on the page of Qwen2.5-VL-32B-Instruct

Qwen3-14B pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Qwen3-14B

Qwen3-30B-A3B pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Qwen3-30B-A3B

Qwen3-30B-A3B-Instruct-2507 pass score 1.00

Answer (generation ok, stop)

To determine the date of the stakeholder briefing for Project Cobalt Fen, we need to locate the relevant information in the provided documents.

In the INTERNAL MEMO | Ref MEM/26/774, the following sentence appears:
"The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

This is the only mention of the stakeholder briefing for Project Cobalt Fen in the documents.

Therefore, the date is 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Qwen3-30B-A3B-Instruct-2507

Qwen3-32B pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is mentioned in the **LAB NOTEBOOK | Entry LAB/26/388** and states it is scheduled for **6 June 2027**.

In YYYY-MM-DD format, this is:

ANSWER: 2027-06-06

This answer on the page of Qwen3-32B

Qwen3-4B-Instruct-2507 pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027, as stated in the internal memo (Ref MEM/26/774) dated 2026-05-09.

ANSWER: 2027-06-06

This answer on the page of Qwen3-4B-Instruct-2507

Qwen3-4B-Thinking-2507 pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is explicitly mentioned in the INTERNAL MEMO | Ref MEM/26/774 dated 2026-05-09. The memo states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

This is the only document that specifies the date for this event. Other documents reference Project Cobalt Fen but in different contexts (e.g., budget reviews), but the stakeholder briefing date is consistently given as 6 June 2027.

Thus, the date in YYYY-MM-DD format is 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Qwen3-4B-Thinking-2507

Qwen3-8B pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027. 

ANSWER: 2027-06-06

This answer on the page of Qwen3-8B

Qwen3-Coder-30B-A3B-Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Qwen3-Coder-30B-A3B-Instruct

Qwen3-Coder-Next pass score 1.00

Answer (generation ok, stop)

2027-06-06

This answer on the page of Qwen3-Coder-Next

Qwen3-VL-30B-A3B-Instruct pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Qwen3-VL-30B-A3B-Instruct

Qwen3-VL-32B-Instruct pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027, as stated in the INTERNAL MEMO | Ref MEM/26/774.

ANSWER: 2027-06-06

This answer on the page of Qwen3-VL-32B-Instruct

Qwen3-VL-8B-Instruct pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

This is mentioned in the INTERNAL MEMO | Ref MEM/26/774, which states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

ANSWER: 2027-06-06

This answer on the page of Qwen3-VL-8B-Instruct

Qwen3.5-27B pass score 1.00

Answer (generation ok, stop)

Based on the **INTERNAL MEMO | Ref MEM/26/774** document, the text states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Converting this date to the YYYY-MM-DD format:
Year: 2027
Month: June (06)
Day: 6 (06)

ANSWER: 2027-06-06

This answer on the page of Qwen3.5-27B

Qwen3.5-35B-A3B pass score 1.00

Answer (generation ok, stop)

Based on the **INTERNAL MEMO | Ref MEM/26/774** dated 2026-05-09, the text states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Although there is a mention of a budget review for the same project later in the document (Meeting Minutes | Ref MIN/26/593), the specific question asks for the date of the **stakeholder briefing**.

Date: June 6, 2027
Format: YYYY-MM-DD

ANSWER: 2027-06-06

This answer on the page of Qwen3.5-35B-A3B

Qwen3.5-4B pass score 1.00

Answer (generation ok, stop)

Based on the documents provided, specifically the **INTERNAL MEMO | Ref MEM/26/774** from Ingrid Cavendish dated 2026-05-09, it states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Additionally, the **MEETING MINUTES | Ref MIN/26/593** mentions that the budget review for Project Cobalt Fen is scheduled for 16 November 2027, but the specific stakeholder briefing date found in the memo is earlier.

ANSWER: 2027-06-06

This answer on the page of Qwen3.5-4B

Qwen3.5-9B pass score 1.00

Answer (generation ok, stop)

Based on the **INTERNAL MEMO | Ref MEM/26/774** from Ingrid Cavendish dated 2026-05-09, the text states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Additionally, the **MEETING MINUTES | Ref MIN/26/593** confirms this date in the first paragraph: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027." Wait, let me re-read carefully.

Re-reading **INTERNAL MEMO | Ref MEM/26/774**:
"The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Re-reading **MEETING MINUTES | Ref MIN/26/593**:
"The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

The question asks specifically for the **stakeholder briefing**. The memo explicitly links "stakeholder briefing" to June 6, 2027. The meeting minutes link "budget review" to November 16, 2027.

Therefore, the date for the stakeholder briefing is 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Qwen3.5-9B

Qwen3.6-35B-A3B pass score 1.00

Answer (generation ok, stop)

Based on the document **INTERNAL MEMO | Ref MEM/26/774** (dated 2026-05-09), the text states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

ANSWER: 2027-06-06

This answer on the page of Qwen3.6-35B-A3B

Qwen3.8-27B pass score 1.00

Answer (generation ok, stop)

Based on the documents provided, specifically the **INTERNAL MEMO | Ref MEM/26/774** dated 2026-05-09, the text states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

ANSWER: 2027-06-06

This answer on the page of Qwen3.8-27B

QwQ 32B pass score 1.00

Answer (generation ok, stop)


ANSWER: 2027-06-06

This answer on the page of QwQ 32B

Sage-A1.5-Q4_K_M pass score 1.00

Answer (generation ok, stop)

Based on the documents provided, the stakeholder briefing for Project Cobalt Fen is mentioned in two places:

1.  In the **INTERNAL MEMO | Ref MEM/26/774** (dated 2026-05-09): "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."
2.  In the **MEETING MINUTES | Ref MIN/26/593** (dated 2026-09-15): "The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

The question specifically asks for the **stakeholder briefing**, not the budget review. Therefore, the correct date is 6 June 2027.

ANSWER: 2027-06-06

This answer on the page of Sage-A1.5-Q4_K_M

SmolLM3-3B pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027. 

ANSWER: 2027-06-06

This answer on the page of SmolLM3-3B

Solar 10.7B Instruct V1 pass score 1.00

Answer (generation ok, stop)

ANSWER: 2027-06-06

This answer on the page of Solar 10.7B Instruct V1

Spark-X2.6-4B pass score 1.00

Answer (generation ok, stop)

Looking at the documents to find the stakeholder briefing date for Project Cobalt Fen:

In the INTERNAL MEMO (Ref MEM/26/358), under the section about Project Cobalt Fen:

"The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Converting this to YYYY-MM-DD format:

ANSWER: 2027-06-06

This answer on the page of Spark-X2.6-4B

Translategemma 12B IT pass score 1.00

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-06-06.

ANSWER: 2027-06-06

This answer on the page of Translategemma 12B IT

Apertus-8B-Instruct-2509 fail score 0

Answer (generation ok, stop)

2027-07-19

ANSWER: 2027-07-19

This answer on the page of Apertus-8B-Instruct-2509

Aya Expanse 32B fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for **2027-07-19**.

ANSWER: 2027-07-19

This answer on the page of Aya Expanse 32B

Codegeex4 9B All fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

This answer on the page of Codegeex4 9B All

Codegemma 2B Code V1.1 fail score 0

Answer (generation ok, stop)

(empty output)

This answer on the page of Codegemma 2B Code V1.1

Codegemma 7B Instruct V1.1 fail score 0

Answer (generation ok, stop)

**Answer:** 2027-07-19

The stakeholder briefing for Project Cobalt Fen is scheduled for 19 July 2027, as per the project status report.

This answer on the page of Codegemma 7B Instruct V1.1

Codellama 13B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of Codellama 13B Instruct

Codellama 34B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of Codellama 34B Instruct

Codellama 7B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Codellama 7B Instruct

Codeqwen 7B Chat V1.5 fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

This answer on the page of Codeqwen 7B Chat V1.5

Cogito 8B V1 Preview Llama fail score 0

Answer (generation ok, stop)

Let me search through the documents to find the date of the stakeholder briefing for Project Cobalt Fen.

Looking through the documents, I find the following relevant information:

From the Project Status Report (Project Vellum):
"The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

From the Meeting Minutes (Procurement weekly sync):
"The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

The stakeholder briefing date is 2026-06-06 (YYYY-MM-DD format).

ANSWER: 2026-06-06

This answer on the page of Cogito 8B V1 Preview Llama

Deepcoder 1.5B Preview fail score 0

Answer (generation ok, stop)


The stakeholder briefing for Project Cobalt Fen was scheduled for November 16, 2027.

ANSWER: 2027-11-16

This answer on the page of Deepcoder 1.5B Preview

Deepcoder 14B Preview fail score 0

Answer (generation truncated, length)

(empty output)

This answer on the page of Deepcoder 14B Preview

Deepscaler 1.5B Preview fail score 0

Answer (generation truncated, length)

(empty output)

This answer on the page of Deepscaler 1.5B Preview

Deepseek Coder 1.3B Instruct fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-11-16.

ANSWER: 2027-11-16

This answer on the page of Deepseek Coder 1.3B Instruct

Deepseek Coder 33B Instruct fail score 0

Answer (generation ok, stop)

I'm sorry, but the information provided does not contain the stakeholder briefing for Project Cobalt Fen scheduled date.

This answer on the page of Deepseek Coder 33B Instruct

Deepseek Coder 6.7B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of Deepseek Coder 6.7B Instruct

Deepseek Llm 7B Chat fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

This answer on the page of Deepseek Llm 7B Chat

Deepseek R1 8B Llama Distill fail score 0

Answer (generation ok, stop)


The stakeholder briefing for Project Cobalt Fen is scheduled for **2027-11-16**.

ANSWER: 2027-11-16

This answer on the page of Deepseek R1 8B Llama Distill

Deepseek V2 16B Lite Chat fail score 0

Answer (generation ok, stop)

 ANSWER: 2027-06-19

This answer on the page of Deepseek V2 16B Lite Chat

DeepSeek-R1-Distill-Qwen-14B fail score 0

Answer (generation ok, stop)


The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-07-19.

ANSWER: 2027-07-19

This answer on the page of DeepSeek-R1-Distill-Qwen-14B

DeepSeek-R1-Distill-Qwen-7B fail score 0

Answer (generation ok, stop)


The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027.

ANSWER: 2027-11-16

This answer on the page of DeepSeek-R1-Distill-Qwen-7B

Dolphin Phi 2.7B V2.6 fail score 0 saw part of the question

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 
20th November 
202 7. 

Answer: 
20th November 
202 7.

This answer on the page of Dolphin Phi 2.7B V2.6

Exaone Deep 7.8B fail score 0

Answer (generation ok, stop)

<thought>
Okay, let me try to figure this out. The question is asking for the date of the stakeholder briefing for Project Cobalt Fen. I need to look through the provided documents to find that information.

First, I'll scan through the lab notebooks, internal memos, and project status reports. Let me start with the first document, the LAB NOTEBOOK from Northfold Instruments. 

Looking at the first LAB NOTEBOOK entry (LAB/26/388), I don't see any mention of Project Cobalt Fen or its briefing. The next one (LAB/26/944) also doesn't mention it. 

Next, the INTERNAL MEMO sections. Scanning through the memos, I see various projects and teams mentioned, but nothing about Cobalt Fen here. 

Now the PROJECT STATUS REPORTS. The first one is Project Vellum, which doesn't mention Cobalt Fen. The next is Project Ferrule, still no. Then there's a mention of Project Lantern in the LAB NOTEBOOK, but again, not Cobalt Fen. 

Wait, looking at the MEETING MINUTES section. The last document here is the Procurement weekly sync meeting minutes. In that document, under the Procurement weekly sync, there's a mention: "The stakeholder briefing for Project Cobalt Fen is scheduled for 19 July 2027." 

So the answer should be 2027-07-19. Let me double-check that. The meeting minutes from Procurement weekly sync on 2026-09-15 mention the briefing for Cobalt Fen in November 2027? Wait no, the date given is 19 July 2027. The text says "scheduled for 19 July 2027." So the date is 2027-07-19. 

I don't see any other references to this in other documents, so that must be the correct answer.
</thought>

ANSWER: 2027-07-19

This answer on the page of Exaone Deep 7.8B

EXAONE-3.5-7.8B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of EXAONE-3.5-7.8B-Instruct

Exaone3.5 2.4B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Exaone3.5 2.4B Instruct

Falcon2 11B fail score 0 not ranked

Answer (generation truncated, repetition_abort)

 K.

This answer on the page of Falcon2 11B

Falcon3 10B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Falcon3 10B Instruct

Falcon3 1B Instruct fail score 0

Answer (generation ok, stop)

2027-11-16

This answer on the page of Falcon3 1B Instruct

Falcon3 7B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Falcon3 7B Instruct

Gemma 3n E4B IT fail score 0

Answer (generation ok, stop)

ANswer: 2027-06-19

This answer on the page of Gemma 3n E4B IT

Gemma 7B Instruct V1.1 fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for **2027-07-19**.

**ANSWER:** 2027-07-19

This answer on the page of Gemma 7B Instruct V1.1

Gemma3 1B IT fail score 0

Answer (generation ok, stop)

ANSWER: 2027-09-15

This answer on the page of Gemma3 1B IT

Gemma3n E2B IT fail score 0

Answer (generation truncated, length)

ANSWER: 2027-07-19

The meeting minutes state: "The stakeholder briefing for Project Lantern is scheduled for 19 July 2027." While the question refers to Project Cobalt Fen, the provided documents do not explicitly state a briefing date for that project. However, the minutes mention a budget review for Project Cobalt Fen scheduled for 2027-11-16. The question asks for the date of the stakeholder briefing for Project Cobalt Fen. The provided documents do not contain this information. However, the Project Lantern team asked for a briefing, and the minutes state that the briefing is scheduled for 19 July 2027. Since the question asks for the date of the stakeholder briefing for Project Cobalt Fen, and the minutes do not provide this information, we cannot definitively answer the question based on the provided documents. However, the question asks for the date in YYYY-MM-DD format. The provided documents do not contain the date of the stakeholder briefing for Project Cobalt Fen.

The question asks for the date of the stakeholder briefing for Project Cobalt Fen. The provided documents do not contain this information. However, the Project Lantern team asked for a briefing, and the minutes state that the briefing is scheduled for 19 July 2027. Since the question asks for the date in YYYY-MM-DD format, we need to provide the date as 2027-07-19.

The question asks for the date of the stakeholder briefing for Project Cobalt Fen. The provided documents do not contain this information. However, the Project Lantern team asked for a briefing, and the minutes state that the briefing is scheduled for 19 July 2027. Since the question asks for the date in YYYY-MM-DD format, we need to provide

This answer on the page of Gemma3n E2B IT

GLM-4.7-Flash fail score 0

Answer (generation truncated, length)

Based on the documents provided, the stakeholder briefing for Project Cobalt Fen is scheduled for **2026-06-18**.

This date is found in the "PROJECT STATUS REPORT | Project Ferrule" section, which states: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." However, in the "PROJECT STATUS REPORT | Project Vellum" section, it is stated: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." Wait, looking closer at the text provided in the prompt:

In the "INTERNAL MEMO | Ref MEM/26/774", it says: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

In the "PROJECT STATUS REPORT | Project Ferrule", it says: "The stakeholder briefing for Project Lantern is scheduled for 19 July 2027."

In the "PROJECT STATUS REPORT | Project Vellum", it says: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

In the "LAB NOTEBOOK | Entry LAB/26/944", it says: "Early feedback on the firmware rollout changes has been mostly positive, although Logistics flagged a backlog of unsigned forms."

In the "INTERNAL MEMO | Ref MEM/26/358", it says: "The vendor audit for Project Ibis is scheduled for 10 June 2027."

In the "PROJECT STATUS REPORT | Project Ferrule", it says: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

In the "MEETING MINUTES | Ref MIN/26/593", it says: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027."

Wait, I need to find the specific date for the stake

This answer on the page of GLM-4.7-Flash

Glm4 9B Chat fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-10

This answer on the page of Glm4 9B Chat

Granite Code 3B Instruct fail score 0 saw part of the question

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-09-15.

This answer on the page of Granite Code 3B Instruct

Granite Code 8B Instruct fail score 0

Answer (generation ok, stop)

2027-06-19

This answer on the page of Granite Code 8B Instruct

granite-4.1-3b fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of granite-4.1-3b

Granite3 Dense 2B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Granite3 Dense 2B Instruct

Granite3 Dense 8B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Granite3 Dense 8B Instruct

Granite3 Moe 1B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2026-08-16

This answer on the page of Granite3 Moe 1B Instruct

Granite3 Moe 3B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Granite3 Moe 3B Instruct

Granite3.1 Dense 2B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

Explanation: The stakeholder briefing for Project Cobalt Fen is scheduled for 19 July 2027, as mentioned in the PROJECT STATUS REPORT | Project Ferrule.

This answer on the page of Granite3.1 Dense 2B Instruct

Granite3.1 Dense 8B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Granite3.1 Dense 8B Instruct

Granite3.1 Moe 1B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2026-07-19

This answer on the page of Granite3.1 Moe 1B Instruct

Granite3.1 Moe 3B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Granite3.1 Moe 3B Instruct

Granite3.2 2B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

Explanation: The stakeholder briefing for Project Cobalt Fen is scheduled for 19 July 2027, as mentioned in the PROJECT STATUS REPORT | Project Ferrule.

This answer on the page of Granite3.2 2B Instruct

Granite3.2 8B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Granite3.2 8B Instruct

Granite3.3 2B fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Granite3.3 2B

Granite3.3 8B fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Granite3.3 8B

Granite4 1B H fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of Granite4 1B H

Granite4 350M H fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled on 2026-07-19.

This answer on the page of Granite4 350M H

Granite4 3B fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2026-09-16. 

ANSWER: 2026-09-16

This answer on the page of Granite4 3B

Granite4 Micro H fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Granite4 Micro H

Granite4 Small H fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-06-19.

ANSWER: 2027-06-19

This answer on the page of Granite4 Small H

Granite4 Tiny H fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-16

This answer on the page of Granite4 Tiny H

Granite4.1 8B fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for **2027-06-16**.

ANSWER: 2027-06-16

This answer on the page of Granite4.1 8B

Granite4.2 3B fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of Granite4.2 3B

Hermes-3-Llama-3.1-8B fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-10

This answer on the page of Hermes-3-Llama-3.1-8B

Hermes3 3B Llama3.2 fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled on 06-06-2027.

This answer on the page of Hermes3 3B Llama3.2

Internlm2 1.8B Chat V2.5 fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-18

This answer on the page of Internlm2 1.8B Chat V2.5

Lfm2.5 Thinking 1.2B fail score 0

Answer (generation ok, stop)

ANSWER: 2026-09-15  
Wait, but after rechecking, the meeting minutes state the meeting is on 2026-09-15. Since the question asks for the date of the stakeholder briefing for Project Cobalt Fen, and the only mention related is the meeting minutes on that date, I'll conclude 2026-09-15. However, I might have missed something. Alternatively, perhaps the date is 2026-06-18 (reporting period ends), but the user might expect that. Alternatively, maybe the answer is 2026-07-19. Wait, the problem states "stakeholder briefing for Project Cobalt Fen"—if the report's next checkpoint is on Monday of the following week after 2026-06-18 (reporting period ends), then 2026-06-25. But since I can't confirm, I'll stick with 2026-09-15 as per the meeting minutes. I'll go with 2026-09-15.

Wait, but the user might expect the date from the follow-up under Rurik Abernathy's memo: "The next checkpoint with Process Engineering is set for Monday of the following week." If the current date is 2026-05-09 (from the internal memo's date), then the following week's Monday would be 2026-06-15. But the meeting minutes are on 2026-09-15. Hmm. Since I have to pick from the data, perhaps the answer is 2026-09-15. I'll proceed with that.
</think>

ANSWER: 2026-09-15  
The stakeholder briefing for Project Cobalt Fen is scheduled on 2026-09-15 as indicated in the meeting minutes. 

\boxed{2026-09-15}

This answer on the page of Lfm2.5 Thinking 1.2B

Lfm3 1.7B fail score 0

Answer (generation truncated, length)

We need to find the date for the stakeholder briefing for Project Cobalt Fen. Let's scan the provided text.

Looking through the sections:

- In "INTERNAL MEMO | Ref MEM/26/774" there is mention: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." That seems directly relevant.

Let me verify if any other mentions exist. Also check "MEETING MINUTES | Ref MIN/26/593": It says "The stakeholder briefing for Project Lantern is scheduled for 19 July 2027." Not Cobalt Fen.

So for Project Cobalt Fen, in MEM/26/774: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."

Thus the date is 2027-06-06? Wait, format is YYYY-MM-DD. So 6 June 2027 becomes 2027-06-06.

But let's double-check if there is another mention elsewhere. Search again: 

- In "PROJECT STATUS REPORT | Project Ferrule" etc., but no.
- In "MEETING MINUTES", also mentions "Project Cobalt Fen" as part of budget review scheduled for 16 November 2027, but that's different.

Specifically, in INTERNAL MEMO | Ref MEM/26/774: 
"The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027." Yes.

Therefore answer: 2027-06-06.

Now output as required: "ANSWER: <value>" on last line.

The stakeholder briefing for Project Cobalt Fen is mentioned in the Internal Memo (Ref MEM/26/774) as being scheduled for 6 June 2027. Converting this to the YYYY-MM-DD format gives 2027-06-06.

ANSWER:

This answer on the page of Lfm3 1.7B

Llama-2-7b-chat-hf fail score 0

Answer (generation ok, stop)

Based on the internal documents provided, the answer to the question "On what date is the stakeholder briefing for Project Cobalt Fen scheduled?" is:

ANSWER: 2027-06-19

This answer on the page of Llama-2-7b-chat-hf

Llama2 13B Chat fail score 0

Answer (generation ok, stop)

LAB NOTEBOOK | Entry LAB/26/944
Analyst: Nadia Fairweather
Instrument: thermal camera
Date: 2026-07-02

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

ANSWER: 2026-06-06

This answer on the page of Llama2 13B Chat

medgemma-4b-it fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of medgemma-4b-it

Mistral Nemo 12B Instruct 2407 fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 19 July 2027.

ANSWER: 2027-07-19

This answer on the page of Mistral Nemo 12B Instruct 2407

Mixtral 8x7B Instruct V0.1 fail score 0

Answer (generation ok, stop)

2027-06-16

Explanation: Based on the documents provided, the stakeholder briefing for Project Cobalt Fen is scheduled for 16 June 2027. This information is found in the PROJECT STATUS REPORT | Project Ferrule, prepared by Callum Lindqvist (Materials Research).

This answer on the page of Mixtral 8x7B Instruct V0.1

Nanbeige_Nanbeige4.3-33B fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027.

ANSWER: 2027-11-16

This answer on the page of Nanbeige_Nanbeige4.3-33B

Nemotron Mini 4B Instruct fail score 0

Answer (generation ok, stop)

 2027-06-19

This answer on the page of Nemotron Mini 4B Instruct

Olmo-3-7B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Olmo-3-7B-Instruct

Olmo2 7B 1124 Instruct fail score 0

Answer (generation ok, stop)

2027-11-16
ANSWER: 2027-11-16

This answer on the page of Olmo2 7B 1124 Instruct

Opencoder 1.5B Instruct fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027. Answer: 20 November 20 27.

This answer on the page of Opencoder 1.5B Instruct

Phi 2.7B Chat V2 fail score 0 saw part of the question

Answer (generation truncated, length)

 ANSWER: 

Topic: <business and management>

Use Case 1:
Title: Project Management Meeting
Participants: Project Manager, Team Leader, Team Members
Actions:
1. The Project Manager calls for a meeting to discuss the progress of the project.
2. The Team Leader presents the project status report, highlighting any issues or concerns.
3. The Project Manager asks for updates from each team member and addresses any questions or concerns.
4. The team discusses any upcoming tasks or milestones and assigns responsibilities.
5. The Project Manager sets a timeline for the project and sets expectations for the team.
6. The team discusses any potential risks and comes up with mitigation strategies.
7. The Project Manager concludes the meeting by summarizing the key points and setting the next meeting date.

Use Case 2:
Title: Budget Review
Participants: Project Manager, Finance Manager, Team Members
Actions:
1. The Project Manager calls for a meeting to review the project's budget.
2. The Finance Manager presents the budget report, highlighting any changes or discrepancies.
3. The Project Manager asks for updates from each team member and addresses any questions or concerns.
4. The team discusses any upcoming expenses and comes up with a plan to stay within the budget.
5. The Project Manager and Finance Manager discuss any potential cost-saving measures.
6. The team discusses any potential risks to the budget and comes up with mitigation strategies.
7. The Project Manager concludes the meeting by summarizing the key points and setting the next meeting date.

Use Case 3:
Title: Stakeholder Briefing
Participants: Project Manager, Stakeholders
Actions:
1. The Project Manager calls for a meeting to discuss the project with the stakeholders.
2. The Project Manager presents the

This answer on the page of Phi 2.7B Chat V2

Phi-3-mini-4k-instruct fail score 0

Answer (generation truncated, length)

the weekly, ands.

snixts.

101.
2.

before.
before.
Before the 2.
Before.
before, ands,000s,0s,02002, and the data before the following.s, buts.
the data. The:0:s.


20s.



100, 

100s,5,2,20s,00s,0,2020,0s.
s.2220s:s.


20, and1202s, and2012, and20, and 
Before 20s to:020s.
:0,0es.

20s, before2002000220, 202, before the 2020s:

s.


the10s:0 20s before the before the before before before before before-before, before the 202000s,1,100020s101020s before2022 before 220:s,022, and 2022, 2020, 22,0e, 2000s:120, and 
201s, and2021.
200.
200020102010s: 22, 2020s.

222.
22222.
2:



2

This answer on the page of Phi-3-mini-4k-instruct

Phi-4-mini-instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Phi-4-mini-instruct

Qwen 0.5B Chat V1.5 fail score 0

Answer (generation ok, stop)

ANSWER: 2026-09-15

This answer on the page of Qwen 0.5B Chat V1.5

Qwen 1.8B Chat V1.5 fail score 0

Answer (generation ok, stop)

Please
Please is the following

This answer on the page of Qwen 1.8B Chat V1.5

Qwen 14B Chat V1.5 fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2027-11-16.

This answer on the page of Qwen 14B Chat V1.5

Qwen 4B Chat V1.5 fail score 0

Answer (generation ok, stop)

The project.

This answer on the page of Qwen 4B Chat V1.5

Qwen 7B Chat V1.5 fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Qwen 7B Chat V1.5

Qwen2 0.5B Instruct fail score 0

Answer (generation ok, stop)

2027-11-15

This answer on the page of Qwen2 0.5B Instruct

Qwen2 1.5B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Qwen2 1.5B Instruct

Qwen2 Math 1.5B Instruct fail score 0

Answer (generation ok, stop)

1. **Understanding the Problem:**
   - We need to determine the date of the stakeholder briefing for Project Cobalt Fen.
   - The stakeholder briefing is scheduled for 16 November 2027.

2. **Given Information:**
   - The stakeholder briefing for Project cobalt Fen is scheduled for 16 November 2027.

3. **Conclusion:**
   - The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027.

The final answer is $\boxed{16\text{ NOV}\text{2027}}$

This answer on the page of Qwen2 Math 1.5B Instruct

Qwen2 Math 7B Instruct fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027.

This answer on the page of Qwen2 Math 7B Instruct

Qwen2-VL-7B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of Qwen2-VL-7B-Instruct

Qwen2.5 0.5B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 16 November 2027

This answer on the page of Qwen2.5 0.5B Instruct

Qwen2.5 Coder 0.5B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Qwen2.5 Coder 0.5B Instruct

Qwen2.5 Coder 1.5B Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of Qwen2.5 Coder 1.5B Instruct

Qwen2.5-3B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Qwen2.5-3B-Instruct

Qwen2.5-7B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-05

This answer on the page of Qwen2.5-7B-Instruct

Qwen2.5-Coder-3B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-01

This answer on the page of Qwen2.5-Coder-3B-Instruct

Qwen2.5-VL-3B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Qwen2.5-VL-3B-Instruct

Qwen2.5-VL-7B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Qwen2.5-VL-7B-Instruct

Qwen3 0.6B fail score 0

Answer (generation ok, stop)

ANSWER: 2026-09-15

This answer on the page of Qwen3 0.6B

Qwen3 1.7B fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of Qwen3 1.7B

Qwen3 VL 2B Instruct fail score 0

Answer (generation ok, stop)

2027-11-16

This answer on the page of Qwen3 VL 2B Instruct

Qwen3 VL 2B Thinking fail score 0

Answer (generation truncated, length)

(empty output)

This answer on the page of Qwen3 VL 2B Thinking

Qwen3-4B fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027. 

ANSWER: 2027-11-16

This answer on the page of Qwen3-4B

Qwen3-VL-4B-Instruct fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-16

This answer on the page of Qwen3-VL-4B-Instruct

Qwen3.5 2B fail score 0

Answer (generation truncated, length)

Based on the text provided in the **INTERNAL MEMO | Ref MEM/26/358**, under the section regarding "The Project Ferrule team," it states: "The vendor audit for Project Ibis is scheduled for 10 June 2027. Data Platform would like a standing slot in the monthly review to report on warehouse consolidation."

However, looking further down in that same memo, there is a specific sentence regarding the stakeholder briefing: "The stakeholder briefing for Project Lantern is scheduled for 19 July 2027."

Wait, let me re-read carefully. The question asks about **Project Cobalt Fen**.
Scanning the text again for "Cobalt Fen":
- In the **INTERNAL MEMO | Ref MEM/26/358**: "...The stakeholder briefing for Project Lantern is scheduled for 19 July 2027." -> This mentions Lantern, not Cobalt Fen.
- In the **PROJECT STATUS REPORT | Project Vellum**: "The next checkpoint with Process Engineering is set for Monday of the following week." (No date).
- In the **MEETING MINUTES | Ref MIN/26/593**: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027." -> This mentions the *review*, not the briefing.

Let me check if I missed a specific mention of the briefing date for Cobalt Fen in any other document.
- **LAB NOTEBOOK | Entry LAB/26/388**: "The Project Quillon team asked that the cleaning-room scheduling figures be checked..." (No).
- **INTERNAL MEMO | Ref MEM/26/774**: "...The Mayfield Calibration contract renewal was discussed briefly; Helga Sandoval will ask for a revised quote

This answer on the page of Qwen3.5 2B

Qwen3.6-27B fail score 0

Answer (generation truncated, length)

To find the date of the stakeholder briefing for Project Cobalt Fen, I need to scan the provided documents for mentions of "Project Cobalt Fen" and "stakeholder briefing".

1.  **LAB NOTEBOOK | Entry LAB/26/388**: Mentions Project Quillon, Brightwater Reagents, Sable Packaging, Oakhaven, Marlow Cross, Linden Falls, Brennick. No mention of Project Cobalt Fen.
2.  **INTERNAL MEMO | Ref MEM/26/774**:
    *   Scanning the text...
    *   Found sentence: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027."
3.  **PROJECT STATUS REPORT | Project Vellum**: Mentions Project Meridian. No mention of Project Cobalt Fen briefing.
4.  **LAB NOTEBOOK | Entry LAB/26/944**: Mentions Pellam, Kestrel Point. No mention of Project Cobalt Fen.
5.  **INTERNAL MEMO | Ref MEM/26/358**: Mentions Project Ferrule, Project Ibis. No mention of Project Cobalt Fen.
6.  **PROJECT STATUS REPORT | Project Ferrule**: Mentions Project Alder, Project Lantern. No mention of Project Cobalt Fen.
7.  **MEETING MINUTES | Ref MIN/26/593**:
    *   Scanning the text...
    *   Found sentence: "The budget review for Project Cobalt Fen is scheduled for 16 November 2027." This is a budget review, not the stakeholder briefing.

The specific question asks for the **stakeholder briefing** date.
From Internal Memo MEM/26/774, the date is

This answer on the page of Qwen3.6-27B

Sailor2 1B Chat fail score 0

Answer (generation ok, stop)

ANSWER: 16 November 2027

This answer on the page of Sailor2 1B Chat

Sailor2 8B Chat fail score 0

Answer (generation ok, stop)

**Answer: 2027-06-10**

(Refer to the INTERNAL MEMO | Ref MEM/26/358 dated 2026-02-26, under the section for Project Cobalt Fen: "The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.")

This answer on the page of Sailor2 8B Chat

Smallthinker 3B Preview fail score 0

Answer (generation ok, stop)

To answer this, I need to carefully analyze the provided documents and extract the relevant information. Let me think about this for a moment... 

The question asks for the date of the stakeholder briefing for Project Cobalt Fen. To find this, I should search through the documents for any mentions of this specific project. Wait, let me check the internal memos and project status reports for any references to Project Cobalt Fen.

As I review the documents, I notice that there are several internal memos and project status reports that mention Project Cobalt Fen. Let me see... In the internal memo Ref MEM/26/358, it mentions that the stakeholder briefing for Project Cobalt Fen is scheduled for 19 July 2027. 

Now, let me verify this information by checking other documents. Ah, yes! In the project status report Ref PRO/26/123, it also mentions the stakeholder briefing for Project Cobalt Fen. 

After carefully reviewing all the relevant documents, I can confirm that the stakeholder briefing for Project Cobalt Fen is indeed scheduled for 19 July 2027. 

Therefore, the answer to the question is: 

ANSWER: 2027-07-19

This answer on the page of Smallthinker 3B Preview

Smollm2 1.7B Instruct fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027.

This answer on the page of Smollm2 1.7B Instruct

Smollm2 135M Instruct fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027.

This answer on the page of Smollm2 135M Instruct

Smollm2 360M Instruct fail score 0

Answer (generation ok, stop)

<value>2026-09-15</value>

This answer on the page of Smollm2 360M Instruct

Stable Code 3B Instruct fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 202
7.

Answer: ANSWER: 6006-06-20

This answer on the page of Stable Code 3B Instruct

Stablelm Zephyr 3B fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 19 July 2027.

ANSWER: 19-07-2027

This answer on the page of Stablelm Zephyr 3B

Stablelm2 1.6B Chat fail score 0

Answer (generation ok, stop)

INTERNAL MEMO | Ref MEM/| 
From: Ingrid Cavendish  Data Platform | To: all Facilities staff | Date: 6-6-2021
Subject: Network segmentation | 
Compared with last quarter, cost per unit improved by 7.7 percent at Corvale, though Harrowgate was flat. Managers are asked to brief their teams on the sample tracking change at the next stand-up. The working assumption is that downtime will stay within 5.5 percent of baseline through June. 

Question: On what date is the stakeholder briefing for Project Cobalt Fen scheduled?
Answer: 2021-07-07

This answer on the page of Stablelm2 1.6B Chat

Stablelm2 12B Chat fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 2023-11-07.

This answer on the page of Stablelm2 12B Chat

Tulu3 8B fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of Tulu3 8B

YI 34B Chat V1.5 fail score 0

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 19 July 2027.

ANSWER: 2027-07-19

This answer on the page of YI 34B Chat V1.5

YI 6B Chat V1.5 fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of YI 6B Chat V1.5

YI 9B Chat V1.5 fail score 0

Answer (generation ok, stop)

ANSWER: 2027-11-16

This answer on the page of YI 9B Chat V1.5

YI Coder 1.5B Chat fail score 0

Answer (generation ok, stop)

The question seems to be asking for a specific answer based on a specific date. However, the documents you provided do not contain any specific dates or information about the dates of other meetings or other items. Without more specific information, it's difficult to provide a specific answer. 

If you could provide more information about the dates or the specific items you're looking for, I could provide a more accurate answer. Otherwise, please provide more context or details about the question you're asking.

This answer on the page of YI Coder 1.5B Chat

YI Coder 9B Chat fail score 0

Answer (generation ok, stop)

ANSWER: 2027-06-19

This answer on the page of YI Coder 9B Chat

Apertus-8B-Instruct-2509 withheld not counted

Withheld: the model stopped after one token on 212 of 270 prompts in our Ollama import, which points to a broken chat template rather than the model. It was re-run with a chat template written from the official one, on the Vulkan backend; those results replace these. This answer is shown as recorded; it has no verdict here and is not counted above.

Answer (generation ok, stop)

2027-07-19

This answer on the page of Apertus-8B-Instruct-2509

Falcon3 10B Instruct withheld not counted

Withheld: Ollama's library chat template for Falcon3 leaves out the newline after the last message, so the model sometimes wrote <|assistant|> itself and its reply came back empty (16 of 270 answers here; a serving bug, not the model). It was re-run with the corrected template; those results replace these. This answer is shown as recorded; it has no verdict here and is not counted above.

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Falcon3 10B Instruct

Falcon3 1B Instruct withheld not counted

Withheld: Ollama's library chat template for Falcon3 leaves out the newline after the last message, so the model sometimes wrote <|assistant|> itself and its reply came back empty (42 of 270 answers here; a serving bug, not the model). It was re-run with the corrected template; those results replace these. This answer is shown as recorded; it has no verdict here and is not counted above.

Answer (generation ok, stop)

2027-11-16

This answer on the page of Falcon3 1B Instruct

Falcon3 3B Instruct withheld not counted

Withheld: Ollama's library chat template for Falcon3 leaves out the newline after the last message, so the model sometimes wrote <|assistant|> itself and its reply came back empty (169 of 270 answers here; a serving bug, not the model). It was re-run with the corrected template; those results replace these. This answer is shown as recorded; it has no verdict here and is not counted above.

Answer (generation ok, stop)

(empty output)

This answer on the page of Falcon3 3B Instruct

Falcon3 7B Instruct withheld not counted

Withheld: Ollama's library chat template for Falcon3 leaves out the newline after the last message, so the model sometimes wrote <|assistant|> itself and its reply came back empty (6 of 270 answers here; a serving bug, not the model). It was re-run with the corrected template; those results replace these. This answer is shown as recorded; it has no verdict here and is not counted above.

Answer (generation ok, stop)

ANSWER: 2027-07-19

This answer on the page of Falcon3 7B Instruct

Internlm2 1.8B Chat V2.5 withheld not counted

Withheld: Ollama's library chat template for InternLM2 ends the prompt without the newline after <|im_start|>assistant, so on 31 of 270 prompts the model ended its turn after one token and its reply came back empty (a serving bug, not the model). It was re-run with the corrected template; those results replace these. This answer is shown as recorded; it has no verdict here and is not counted above.

Answer (generation ok, stop)

:The stakeholder briefing for Project Cobalt Fen is scheduled for 6 June 2027.

This answer on the page of Internlm2 1.8B Chat V2.5

Qwen2 Math 1.5B Instruct withheld not counted

Withheld: Ollama's library chat template for Qwen2-Math differs from the official one (no newline between turns or after the final <|im_start|>assistant, and no default system turn). It was re-run with the official template; those results replace these (the scores changed very little). This answer is shown as recorded; it has no verdict here and is not counted above.

Answer (generation ok, stop)

1. **Understanding the Problem:**
   - We need to determine the final date of a stakeholder meeting for Project cobalt Fen.
   - The meeting date is set for 16 November 2027.

2. **Given Information:**
   - The stakeholder meeting is scheduled for 16 November 2027.
   - We need to provide the answer in the format <value> <year-month> as specified.

3. **Conclusion:**
   - The final answer is straightforward since the meeting date is explicitly given as 16 November 2027.
   - Therefore, the answer is:

\[
\boxed{16-2027}
\]

This answer on the page of Qwen2 Math 1.5B Instruct

Qwen2 Math 7B Instruct withheld not counted

Withheld: Ollama's library chat template for Qwen2-Math differs from the official one (no newline between turns or after the final <|im_start|>assistant, and no default system turn). It was re-run with the official template; those results replace these (the scores changed very little). This answer is shown as recorded; it has no verdict here and is not counted above.

Answer (generation ok, stop)

The stakeholder briefing for Project Cobalt Fen is scheduled for 16 November 2027.

This answer on the page of Qwen2 Math 7B Instruct

The same data as JSON: long_context-004.json. Compare two models to see every question where they differ.